Test equipment

The client commissioned the development of this test equipment to assess their devices as they exited the production line. Since test duration incurs costs, minimising the time required for testing was crucial. The test gear can program the production board and evaluate all the serial peripherals, power rails, and temperature sensors. This entire process, including programming and testing, takes only 30 to 40 seconds, assuming no issues exist. If any errors are detected, they are attributed to the particular peripheral being evaluated, and a specific reason is provided for the error.